Texaco
15 Jan 2000
When Texaco needed to process 80m3/hr more water through the boilers at its Pembroke refinery (above), it had a purity problem on its hands, as the quality of industrial feedwater is too low to be transformed into process steam. The solution, supplied by Ecolochem and consisting of a two-stage filtration/ion exchange system, was installed only the day after Texaco had briefed the company on its requirements.