UK AND INTERNATIONAL PLANT COST INDICES
29 Mar 2000
Process Engineering's PREDICT plant cost index for the UK is made up of five components covering mechanical IM, electrical IE, civil engineering IC, site engineering IS, and project overheads IO. These are all calculated to the base 1996=100, as are the composite indices for the 13 countries that we have been regularly reporting each month. The new additions (see above) will be included once data is available on a consistent basis.
{{UK PLANT COST INDICES AUG 1999 - OCT 1999
INDICES AUG SEP OCT
I 104.5 106.6 107.1IM 104.4 104.4 104.7IE 93.2 96.8 97.0IC 106.8 107.2 107.8IS 114.4 115.5 116.6IO 106.1 105.9 106.4
R = revised value; P = provisional value; F = forecast value}}
{{INTERNATIONAL COST INDICES AUG 1999 - OCT 1999
Country AUG SEP OCT
Australia 104.8 105.0F 105.0FAustria 106.8 106.9 107.0Belgium 104.3 104.7F 104.7FCanada 102.9 102.5 102.5Denmark 111.5 111.7 111.2FFrance 107.0 107.0 107.0FGermany 106.1 107.4F 107.4FItaly 108.4 110.0F 110.0FJapan 99.5 101.5 101.5Netherlands 108.6 108.6 108.7Spain 107.6 110.4F 110.4FSweden 106.3 107.0F 107.0FUSA 101.9 102.1 101.9
R = revised value; P = provisional value; F = forecast value}}