Process Engineering's PREDICT plant cost index for the UK is made up of five components covering mechanical IM, electrical IE, civil engineering IC, site engineering IS, and project overheads IO. These are all calculated to the base 1996=100, as are the composite indices for the 13 countries that we have been regularly reporting each month. The new additions (see above) will be included once data is available on a consistent basis.
{{UK PLANT COST INDICES DEC 1999 - FEB 2000
INDICES DEC JAN FEB
I 108.2 108.4R 108.5FIM 105.5 105.7 105.9FIE 98.0 98.1R 98.3FIC 108.5R 108.8 108.9FIS 118.1R 118.3R 118.5FIO 107.6 108.0R 108.0F
R = revised value; P = provisional value; F = forecast value}}
{{INTERNATIONAL COST INDICES DEC 1999 - FEB 2000
Country DEC JAN FEB
Australia 105.8 107.8 107.9FAustria 108.3 108.2 108.5FBelgium 105.0 107.2 107.2FCanada 105.0 105.4 106.1FDenmark 112.3 113.3 113.5FFrance 107.4 109.5 109.9FGermany 107.7 109.1 109.2FItaly 108.8 110.2 110.3FJapan 96.7 101.7 102.2Netherlands 108.7 110.0 110.2FSpain 109.1 110.9 110.9FSweden 108.1 109.6 109.7FUSA 101.9 101.7 101.9