Water falls
22 Aug 2000
Weir Pumps has won a £500 000 order for two contracts from South Holland Drainage Board and British Waterways, for seven submersible canister pumps. The large pumps are capable of pumping up to 2500 litres/second and will be installed at Gloucester Docks and Spalding pump station.