Acoustics monitoring prevents downtime at lime quarry
13 Aug 2007
CNES -- the maintenance, condition monitoring and engineering services company within Corus Group -- works closely with Shapfell Lime Quarry, providing monthly patrol monitoring. The engineers use various condition monitoring equipment and techniques, including handheld acoustic monitoring devices and vibration monitoring systems.
On a recent patrol monitoring visit, a CNES engineer discovered unusually high readings on the primary crusher at the site. Further investigation using acoustic and vibration analysis systems linked the unusual noise levels and irregular readings to a fault on one of the primary crusher’s main bearings, which had been running for over 30 years. Significant wear and damage were found on the inner raceway of the bearing.
By analysing the results, CNES was able to advise Shapfell’s maintenance team when it should plan to replace the bearing. Shapfell’s maintenance engineers were mobilised and the bearing replacement took place at a scheduled plant shutdown period, without causing any major disruption to the crushing process.
“By using our extensive knowledge and experience of condition monitoring tools and techniques, our engineers were able to detect the fault on the bearing before it failed, according to Ian Taylor, business development engineer, plant condition monitoring at CNES.
“For this particular site, we used handheld acoustic monitoring meters. The bearing was replaced within one week during a shutdown period, so there were no disruptions to production,” said Taylor. “If we hadn’t spotted the bearing problem and it had failed during operation, the plant would have lost at least two weeks’ production, while the bearing was replaced and the required manpower and lifting gear were mobilised on site.”
At Shapfell, the first stage in the production of lime is the quarrying of the limestone itself. The quarrying of the limestone takes place on a 47-hectare site, one mile east of the Lime Works. Drilling and blasting in the quarry are undertaken by sub-contractors, under the strict control of Shapfell Quarry Management.
The average face height is 18 metres and blasts of between 10–30,000 tonnes of stone are carried out. The shot stone is loaded and transported by dump trucks through a series of internal roads to the crushing plant.
In the crushing plant, limestone is crushed in a primary jaw crusher, screened and then transported to the secondary roll crusher. Further screening takes place, with the small material being used primarily in the iron making process or sold locally as stone products. The larger limestone, suitable for the kilns, is transferred to an outdoor stockpile. Limestone from this pile is fed into a washing plant, where scrubbers, screens and thickeners are used to remove contamination and produce a clean raw material for burning in the kilns.
Paul Wright, engineering manager at Shapfell said: “By understanding which condition monitoring technique is appropriate for maintaining each piece of machinery or bearing, we can maintain output, efficiency and profitability of the plant at all times. Our own maintenance team has also been able to learn from CNES engineers.”
CNES is also helping Shapfell monitor and maintain blower systems at the site. The blowers supply combustion and cooling air to the lime kilns, so are critical. If they seize up due to excess dust particles building up on the surface of the rotor blades, the equipment can break down, causing downtime and disruption to production.
Patrol monitoring of the blowers, using vibration monitoring and acoustics techniques, again, means that CNES is able to predict faults before they cause serious damage to the blowers and losses in production.